Wastewater Pump Stations No. 5, 7, 19, 25 and 28

City of Oklahoma City, OK

The City Oklahoma City (City) selected Cowan Group Engineering (CGE) to rehabilitate or replace five (5) existing wastewater pump stations. An assessment of each pump station included an analysis of the structural integrity, automation, generation energy power, and operational hydraulics.

Following assessment, CGE prepared construction drawings and specifications to bring each station to an acceptable level of service. CGE was responsible for construction management and inspection of all work performed.

Relevant Projects